{"id":77189,"date":"2025-04-25T11:34:50","date_gmt":"2025-04-25T09:34:50","guid":{"rendered":"https:\/\/sectormaritimo.es\/?p=77189"},"modified":"2025-04-25T11:34:50","modified_gmt":"2025-04-25T09:34:50","slug":"instalado-el-primer-monopilote-del-parque-eolico-marino-east-anglia-three","status":"publish","type":"post","link":"https:\/\/rin.inno-t.es\/index.php\/2025\/04\/25\/instalado-el-primer-monopilote-del-parque-eolico-marino-east-anglia-three\/","title":{"rendered":"Instalado el primer monopilote del parque e\u00f3lico marino East Anglia THREE"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">ScottishPower Renewables, anuncia que oficialmente ya est\u00e1 en marcha la construcci\u00f3n del parque e\u00f3lico marino East Anglia THREE.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El primer monopilote, de 83,89 m de altura, 10,6 m de di\u00e1metro y un peso de 1.800 t, es el m\u00e1s grande instalado hasta la fecha desde una jack-up autolevable en Europa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">East Anglia THREE ser\u00e1 el mayor parque e\u00f3lico de la historia del grupo Iberdrola y el segundo m\u00e1s grande del mundo cuando entre en funcionamiento. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El monopilote, fabricado por la empresa conjunta Navantia Seanergies Windar Renovables (JVNW), fue instalado por la jack-up <em>Seaway Ventus<\/em>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es el primero de los 95 monopilotes que se est\u00e1n fabricando para el parque e\u00f3lico de 1,4 GW, el mayor de las carteras de ScottishPower e Iberdrola.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">JVNW fabrica 45 de las 95 cimentaciones del proyecto, mientras que Haizea fabrica las 50 restantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cada uno de los 95 monopilotes tendr\u00e1 entre 67 y 85 metros de longitud, hasta 10,6 metros de di\u00e1metro y un peso de entre 1200 y 1800 toneladas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sostendr\u00e1n 95 aerogeneradores Siemens Gamesa de 14,7 MW que generar\u00e1n un total de 1400 MW de energ\u00eda limpia, suficiente para abastecer a m\u00e1s de 1,3 millones de hogares.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tambi\u00e9n se ha instalado la primera de las 95 piezas de transici\u00f3n, producidas por Windar Renovables, de 20 metros de altura, 8 metros de di\u00e1metro y m\u00e1s de 400 toneladas de peso cada una.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Seaway7 est\u00e1 instalando los tres monopilotes y piezas de transici\u00f3n de East Anglia. Para ello, el buque jack-up <em>Seaway Ventus <\/em>ha sido equipado con un conjunto de equipos de misi\u00f3n a medida, dise\u00f1ado, fabricado e instalado en menos de dos a\u00f1os para cumplir con el cronograma del proyecto y los requisitos de rendimiento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Se espera que la instalaci\u00f3n de las 95 turbinas se complete a principios de 2026.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Construction has begun on East Anglia THREE\" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/FdyFMKoqW6k?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-revista-ingenier-a-naval wp-block-embed-revista-ingenier-a-naval\"><div class=\"wp-block-embed__wrapper\">\nhttps:\/\/rin.inno-t.es\/scottishpower-firma-acuerdos-de-fletamento-con-varias-companias-de-norfolk-para-prestar-servicios-al-east-anglia-three\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>ScottishPower Renewables, anuncia que oficialmente ya est\u00e1 en marcha la construcci\u00f3n del parque e\u00f3lico marino East Anglia THREE. El primer monopilote, de 83,89 m de altura, 10,6 m de di\u00e1metro y un peso de 1.800 t, es el m\u00e1s grande instalado hasta la fecha desde una jack-up autolevable en Europa. East Anglia THREE ser\u00e1 el [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":77191,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57],"tags":[32,34,93,60],"class_list":["post-77189","post","type-post","status-publish","format-standard","has-post-thumbnail","category-energias-marinas","tag-construccion-naval","tag-offshore","tag-parque-eolico","tag-video"],"_links":{"self":[{"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/posts\/77189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/comments?post=77189"}],"version-history":[{"count":0,"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/posts\/77189\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/media\/77191"}],"wp:attachment":[{"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/media?parent=77189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/categories?post=77189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rin.inno-t.es\/index.php\/wp-json\/wp\/v2\/tags?post=77189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}